2004 Hurricanes Ivan
Agency: Escambia County
Project Description: This was a massive sand hauling operation that involved recovering sand from roadways and residential yards along 8 miles of beach. That sand was then hauled to 1 of 8 different screening sites, once debris was screened out, the clean sand was then hauled back to the beach to rebuild the protective dunes. In total this operation recovered over 2 Million cubic yards of sand and hauled as much as 15,000 cubic yards in a single day.

